From Static MRP to Adaptive...

Planning
Intelligence

The MRP Refinery is the AI-native MRP system that handles both sides of the planning problem: the computation and the intelligence required to keep it accurate. So you can stay out of the spreadsheets, stop firefighting, and focus on growing your operations.

M
Eliminate Shortages
Cut Excess Stock
Hit Every Ship Date
Reduce Firefighting
Get Ahead of Supply Risk

The Problem

MRP Calculates the Plan.
But you Manually Maintain it.

MRP systems have always had one fatal flaw. They are only as good as the data going into them. And that data has always been maintained using spreadsheets, reports, and disconnected processes.

This includes your:

  • Demand Forecasts
  • BOMs
  • Lead Times
  • Safety Stocks
  • Planning Policies

By the time you go through these processes and update your plan, reality has drifted. This means you are constantly running your operations on out-of-date information.

With supply chains in constant flux and products getting more complex, you can't have a barrier between the decision-making and the execution.

Planned (Static) Reality (Drifting)
📈 Demand Forecast
10,000 units/mo
12,500
Lead Time
14 days
21 days
📦 Safety Stock
200 units
120
🚚 Supplier Reliability
95%
82%
⚠️ Scrap Rate
2.0%
5.7%
⚠️ When key parameters drift, MRP recommendations become unreliable.
Our Solution

The Intelligence Layer Isn't Separate.
It's Built In.

Our 3-layer Approach to Planning Intelligence

Part Master ✓ 312 parts loaded
Part No. Description Lead Time SS Planning
A-201Mounting Bracket2 wks100MRP
A-204Drive Assembly3 wks300MRP
B-107Control Module4 wks200MRP
B-112Sensor Array1 wk80Min-Max
C-301Power Supply3 wks120Min-Max
Bill of Materials 8 unmatched
Lvl Part No. Description Qty Status
0CRN-100Crane Assembly1 EA✓ Match
1A-204Drive Assembly2 EA✓ Match
1B-112Sensor Array4 EA✓ Match
1D-102Mounting Frame6 EA✓ Match
1F-8992 EA⚠ No match

AI-Native MRP + Data Foundation

A clean planning foundation from day one. MRP Refinery doesn't just record your data; it reasons about it, validates it, and keeps it calibrated as your operation evolves.

Running impact analysis on your Lead Time and Safety Stock change for part A-204.
Impact Analysis
Direct —Lead time updated 3 wks → 5 wks in Part Master.
Direct —Safety stock updated 260 → 300 in Part Master.
Downstream —Planning message pulled in, showing late. Req qty +40 units.
Risk —Potential shortage. Release planning message immediately.

Impact & Scenario Simulation

When conditions change or new decisions need to be made, see the downstream impact of every decision before committing. Simulate and compare various scenarios, so you can make confident decisions and not risk impacting production.

Lead Times Updated Veridian · 14 parts
Part Description Old LT New LT Status
A-204Actuator Asm21d28dStaged
B-2291Valve Body14d21dStaged
D-5530Motor Mount18d25dStaged
F-1102Shaft Seal Kit10d17dStaged
K-8801Pump Housing22d29dStaged
+ 9 more parts updated

Continuous Plan Optimization

The plan keeps itself accurate and optimized. An automated feedback loop continuously audits your planning parameters, identifies risks, and suggests changes to combat drift. That way your plan is always accurate and you stay ahead of any problems.

Real Tangible Results
with Planning Intelligence.

An intelligent planning system provides the best plan, no matter what gets thrown your way.

Inventory Optimization

Reduce excess inventory and optimize cash flow while maintaining product service levels.

$ !

Revenue Protection

Prevent lost or delayed revenue due to material shortages and other planning issues.

Operational Efficiency

Eliminate firefighting, manual parameter tuning, machine and operator downtime, and other operational inefficiencies.

Upgrade Your Planning.

Make your planning system smarter with The MRP Refinery’s Planning Intelligence.